Steinmetz / Demeyer
Luxemburg - 2011
The light steel structure of the bridge will be approximately 23 and a half metre slong. The bridge will be supported at the landscaping level at one end where there is a new reception building for the building complex. At the other end, where it meets the historic City Hall, the bridge will be designed to transfer no additional loads to the existing structure.
The sides of the walkway will be enclosed with screen printed, insulating glass units. The inside of the roof will be timber with the outside covered with screen printed glass. The underside of the walkway is clad with composite panels.